1977-86  /   1987-96  /   1997-03  /   Current  /   Future  /   Conference News

Thursday, October 21

8:00 – 8:45 Conference Start
8:45 – 9:30 0401 Automated Pipeline Optimization (APO) for Nominations Management & Compressor Fuel Minimization
Dale R. Rusnak & E. Philip Ferber - Dominion Transmission
A demonstration of a static model to minimize compressor fuel usage in Dominion's Gas Transmission system: highlighting measured savings, semi-automated calibration techniques and an "Expert System" employed to attain fuel minimization in transient operations - an approach to transient optimization.
9:30 – 10:15 0402 Rich Gas Pipeline Operations During Tail-end Production
Dr. Lars Hagesæther and Dr. Ronny Albrechtsen - Statoil Natural Gas
Ronny S. Bruvold - Statoil Exploration and Production
Willy Postvoll - GASSCO
The multiphase pipeline from Huldra to Heimdal will represent an increasingly difficult operational challenge during the tail-end production phase as the throughput is reduced gradually. A project was initiated to identify possible options to extend the lifetime of Huldra. The key results from this project, mostly based on multiphase flow analysis using the OLGA2000 simulation tool, will be presented, discussed and compared to operational experience.
10:15 – 10:30 Break
10:30 – 11:15 0403 The Modeling of Multiphase Systems under Steady-State and Transient Conditions – A Tutorial
Dr. Ivor R. Ellul & Geir Saether - Knowledge Reservoir
Mack Shippen - Schlumberger
This tutorial focuses on the complex analysis of multiphase flow in pipelines with emphasis on currently available modeling tools.  Case studies will be selected and simulated in “real time” to engage the audience in the modeling process.
11:15 – 12:00 0404 Real Time Commercial Supervision at Petrobras
Odilia Dauzacker& Marcos Moraes - Petrobras
Anthony Collins & William Fernandez - Energy Solutions International
This presentation discusses the implementation of a real-time model and gas transaction management system for the gas shippers at Petrobras.  The integrated system provides Petrobras with the capability to schedule, consolidate, allocate, and provide detailed energy and volume information for invoice generation and provides real-time supervision of the shipper contracts.
12:00 – 1:15 Lunch
1:15 – 2:00 0405 Series or Parallel Arrangement for a Compressor Station?A Recurring Question that Needs a Convincing Answer
Sidney Pereira dos Santos - Petrobras
This presentation brings back the attention to the compressor station arrangement under a transient analysis as part of a real transportation system with a practical approach.
2:00 – 2:45 0406 Better Automatic Tuning of On-Line Models
Dr. Jason Modisette - Atmos International
This presentation reports on a new method of tuning pipeline models that simultaneously considers SCADA and model results from a large time span to find the best physical explanation for SCADA/model discrepancies.  This approach allows better error compensation than traditional tuning methods.
2:45 – 3:15 Chairman’s Session
3:15 – 3:45 Break
3:45 – 4:00 0407 Update on PSIG Standards Initiative
PSIG Standards Committee
This paper will give an update on the status of the PSIG standards initiative and a demonstration of the portions of the XPLS which are available for review.
4:00 – 4:45 0408 The Physics of Centrifugal Compressor Performance
Rainer Kurz - Solar Turbines, Inc.
This presentation explains the physical background of the working principles and the operational behavior of centrifugal   compressors, as well as important subsystems such as seals and surge control.
6:00 – 7:30 Reception